Zonal Flexibility Assessment of High-Renewable Power Systems: A KPI-Based Study of the SE3 Bidding Zone in SwedenShow others and affiliations
2026 (English)In: Journal of Physics: Conference Series, Institute of Physics , 2026, no 1Conference paper, Published paper (Refereed)
Abstract [en]
High renewable energy penetration increases system flexibility requirements, making zone-level assessment essential for long-term system planning. Many previous studies relied on single-metric approaches, capturing only specific aspects of flexibility. More recent work introduced multiple indicators but still assumed fixed reserve margins that fail to reflect the actual flexibility requirements. This study assesses flexibility using four key performance indicators (KPIs): (1) Net Load Ramp Requirement (NLRR), the maximum generation adjustment rate needed to balance net load changes; (2) Insufficient Ramping Resource Expectation (IRRE), the probability that ramping demand exceeds available capacity; (3) Flexibility Reserve Margin (FRM), excess flexible capacity beyond worst-case renewable variability; and (4) Interconnection Flexibility Index (IFI), the extent to which renewable fluctuations can be balanced through interconnection-based cross-border exchanges. The assessment is applied to evaluate the flexibility status for one of the bidding zones of Sweden, SE3, using hourly data of 2024. Results indicated high flexibility adequacy, with limited ramping shortages and strong interconnection support. For example, the maximum NLRR reached 340 MW/h in winter, indicating significant upward flexibility demand. IRRE was 0.03% or 3 hours/year, implying ramp-scarcity occurs infrequently. The minimum FRM was 287%, showing that SE3 had strong flexibility support, mainly from interconnections (78%) and hydropower, and IFI reached 501% for upward ramping (import increases) and 424% for downward ramping (import decreases), indicating strong inter-zonal buffering. These KPIs-based results suggest that SE3 maintained high operational flexibility in 2024, mainly supported by cross-border interconnections, providing a basis for future flexibility risk assessment under extreme conditions.
Place, publisher, year, edition, pages
Institute of Physics , 2026. no 1
Series
Journal of Physics, ISSN 1742-6588
Keywords [en]
Integrated circuit interconnects, Cross-border, Flexibility index, Generation adjustment, Key performance indicators, Multiple indicators, Renewable energy penetrations, Renewable power systems, Renewables, System flexibility, System planning, Renewable energy
National Category
Energy Systems
Identifiers
URN: urn:nbn:se:mdh:diva-79213DOI: 10.1088/1742-6596/3214/1/012017Scopus ID: 2-s2.0-105052422445OAI: oai:DiVA.org:mdh-79213DiVA, id: diva2:2110231
Conference
8th International Conference on Energy Storage and Intelligent Vehicles, ICEIV 2025, 5-7 December, 2025
Note
Content from this work may be used under the terms of the Creative Commons Attribution 4.0 licence.
2026-10-142026-10-142026-10-14Bibliographically approved