https://www.mdu.se/

mdh.sePublikasjoner
Endre søk
Begrens søket
1 - 1 of 1
RefereraExporteraLink til resultatlisten
Permanent link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Treff pr side
  • 5
  • 10
  • 20
  • 50
  • 100
  • 250
Sortering
  • Standard (Relevans)
  • Forfatter A-Ø
  • Forfatter Ø-A
  • Tittel A-Ø
  • Tittel Ø-A
  • Type publikasjon A-Ø
  • Type publikasjon Ø-A
  • Eldste først
  • Nyeste først
  • Skapad (Eldste først)
  • Skapad (Nyeste først)
  • Senast uppdaterad (Eldste først)
  • Senast uppdaterad (Nyeste først)
  • Disputationsdatum (tidligste først)
  • Disputationsdatum (siste først)
  • Standard (Relevans)
  • Forfatter A-Ø
  • Forfatter Ø-A
  • Tittel A-Ø
  • Tittel Ø-A
  • Type publikasjon A-Ø
  • Type publikasjon Ø-A
  • Eldste først
  • Nyeste først
  • Skapad (Eldste først)
  • Skapad (Nyeste først)
  • Senast uppdaterad (Eldste først)
  • Senast uppdaterad (Nyeste først)
  • Disputationsdatum (tidligste først)
  • Disputationsdatum (siste først)
Merk
Maxantalet träffar du kan exportera från sökgränssnittet är 250. Vid större uttag använd dig av utsökningar.
  • 1.
    Abdelwahab, Zeid
    et al.
    Mälardalens universitet, Akademin för ekonomi, samhälle och teknik.
    Al Choueyri, Maroun
    Mälardalens universitet, Akademin för ekonomi, samhälle och teknik.
    LEAN CONSTRUCTION: En studie av Heby vårdboende2022Independent thesis Basic level (professional degree), 10 poäng / 15 hpOppgave
    Abstract [en]

    Most construction companies want to deliver the best possible results for their customers while spending the least possible resources. Nevertheless, the construction industry has traditionally been full of unnecessary inefficiency regarding workflows. One of the most successful methods to prevent inefficiency workflow is lean construction. Lean construction consists of various methods that aim to streamline workflow as optimally as possible. Purpose: The purpose of the degree project is to use specific lean methods and tools to identify different waste and be able to use them to reduce downtime of a studied construction project. Method: A case study has been carried out where the project Heby - care homes has been studied. To gather more information a survey study has been done. To gather even further information about the project an interview was conducted with a person who has a leading role. Results: The result shows a analysis of the survey and the interviewe answers. It also includs working methods, transparency and waste minimization. Furthermore it includs solutions like identify problems, create order and structure, standardize and work on improvements. Conclusions: The conclusion that can be drawn is that standardizations in the form of checklists and guides need to be in each project. More openness and to review your chosen forms of agreement. To have a more dynamic working group that strives to achieve common goals and continuous improvements. These are the most important aspects of making a project effective.

1 - 1 of 1
RefereraExporteraLink til resultatlisten
Permanent link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf