mdh.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Hantering av fukt: Innan och under byggtid
Mälardalen University, School of Business, Society and Engineering.
2016 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

The aim of this bachelor’s thesis was to examine the method that Skanska Healthcare has

used in their current project in order to prevent moisture damages from arising.

Furthermore, another substantial aim was to inspect the actions that have been used in the

management of these damages. By examining various approaches of reducing the probability

or preventing the emergence of moisture damages, a clearer insight can be achieved which

consecutively could facilitate future studies within the same area. Thus, an analysis of the

method used by Skanska Healthcare in order to prevent moisture damages is in this regard

suitable and relevant. This study was based on Skanska Healthcare’s current project, which is

the New Karolinska Solna Phase 5b. To achieve the aims of the study, a literature study was

used along with other data which includes documents, moisture safety rounds and diagrams

that have been created by Skanska Healthcare. Furthermore, the extensive literature study

was carried out in order to present a solid overview of the planned project. By dint of the

literature study, this bachelor’s thesis could be mapped out. The information was searched

for and retrieved from printed books, the internet and course literature of the subject

building physics at Mälardalen University. The result of the study showed that Skanska

Healthcare has used the industry standard ByggaF to undertake the moisture issues of the

project. By using this method, they have been able to ensure, document and communicate on

moisture safety throughout the entire construction process. Furthermore, the result also

showed that by constantly documenting and verifying all planned and executed operations,

Skanska Healthcare has been able to obtain a beneficial overview of the project. Also weekly

moisture safety rounds are implemented in order to note any discrepancies. Moreover, a

special routine founded by Skanska themselves is pursued to cope with the discovery of

potential risks.

Place, publisher, year, edition, pages
2016.
National Category
Construction Management
Identifiers
URN: urn:nbn:se:mdh:diva-32256OAI: oai:DiVA.org:mdh-32256DiVA: diva2:943949
External cooperation
Skanska Healthcare
Subject / course
Building Engineering
Supervisors
Examiners
Available from: 2016-07-04 Created: 2016-06-28 Last updated: 2016-07-04Bibliographically approved

Open Access in DiVA

Hantering av fukt - Innan och under byggtid(4142 kB)47 downloads
File information
File name ATTACHMENT01.pdfFile size 4142 kBChecksum SHA-512
df64e69c08ff9274f8f75a8ca96ea09e44905ee553144670886ff35e1988b174af80e23611b71f396454fb322938768e4a4d2dc3dbc28b4eab3848a121d75e0c
Type attachmentMimetype application/pdf

Search in DiVA

By author/editor
Moini Mostofi, Ramtin
By organisation
School of Business, Society and Engineering
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 100 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf