mdh.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Rättvisande priser: En fallstudie på måleriavdelningen på Volvo Construciton Equipment
Mälardalen University, School of Innovation, Design and Engineering.
Mälardalen University, School of Innovation, Design and Engineering.
2016 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Fair prices : A case study in the paintshop in Volvo Construction Equipment (English)
Abstract [sv]

Titel Rättvisa priser – En fallstudie på Volvo Construction Equipment (CE)Nyckelord Kostnadsfördelning, produktkalkylering, rättvis kostnadsfördelning, aktivitetsfördelning,värdeskapande aktiviteter.Syfte Syftet med fallstudien är att kartlägga värdeskapande aktiviteter, undersökavilken aktivitet som differentierar produkterna bäst och se hurprocesstiden/tiderna för en aktivitet kan användas som fördelningsnyckel vidfördelning av kostnader.Målningsprocessens aktiviteter har grundligt granskats och av dessa har de värdeskapandeprocesserna identifierats. Två slutsatser har dragits av fallstudien: Den tid som differentierar produkterna bäst är mantiden. Desto fler aktiviteter som involveras i kostnadsfördelningen, desto rättvisare blirkostnadsfördelningen. En summering av tiden i målningsroboten, rengöringen ochmantiden resulterar i ett bra underlag att kostnadsfördela på. Med reservation för attarbetet som utförs av operatörerna, mantiden, helst ska vara standardiserat.Produktkalkylering handlar om att fördela ett företags kostnader på dess produkter, vilket ärlättare sagt än gjort. Problemet kring kostnadsfördelning har diskuterats fram och tillbaka desenaste femtio åren. Hur ska ett företag fördela sina kostnader, direkta och indirekta, på sinaprodukter och tjänster för att de ska generera ett rättvist pris för produkterna och tjänsterna? Dedirekta kostnaderna är enkla att härleda till sitt kostnadsobjekt, men de indirekta kostnaderna ärbetydligt besvärligare.Studien undersöker vilka processer som är värdeskapande i målningsprocessen och av dessaprocesser har fyra olika scenarier skapats. Varje scenario består av olika värdeskapandeaktiviteter och deras processtider. Finansavdelningen på Volvo CE simulerade enkostnadsfördelning med varje scenario som underlag för fördelningen och utfallet avsimuleringen analyserades.Studien är gjord som en fallstudie på måleriavdelningen på Volvo CE. Författarna är EmiliaVardanyan och Erik Söder. Handledare på högskolan är universitetslektor Antti Salonen ochhandledare på Volvo CE produktionschef Josef Lännerstöm.

Abstract [en]

Title Fair prices – A case study in Volvo Construction Equipment (CE)Keywords Cost allocation, product costing, fair cost allocation, activity allocation, valueaddedactivities.Purpose The purpose of this paper is to locate the value added activities, investigatewhich activity that differentiate the products best and see how the processtime/times for an activity can be used as an allocation key for allocating costs.The activities at the department of painting have been examined and the value-added activitiesof these have been identified. Two conclusions have been made by the work. The time that differentiate the products best are the manual time, the work performedby man. The more activities that the cost allocation includes the more correct and fair thecalculation will be. The sum of the time in the painting robot, the cleaning process andthe manual time result in good a basis for cost allocation. With the reservation that thework performed by man should be standardized.Product calculation is about allocation of the cost in a company, which is easier said than done.The problems related to cost allocation has been discussed back and forward the latest fiftyyears. How should companies allocate their costs, direct and indirect costs, on their productsand services to give their products and services a fair price? The direct costs are easy to deriveto their cost object, but the indirect costs are way harder to work with.This paper investigates which processes that are value-adding in the paint shop and from theseprocesses four scenarios are made. Every scenario is made of different value-added activitiesand their process times. The finance department at Volvo CE simulated a cost allocation withevery scenario as basis and the result of the simulation were analysed.The work has been done as a case study in the paint shop at Volvo CE. The authors are EmiliaVardanyan and Erik Söder. The supervisor at Mälardalens university are associated professorAntti Salonen and the supervisor at Volvo CE are manager production engineering assemblyJosef Lännerström.

Place, publisher, year, edition, pages
2016. , 51 p.
Keyword [en]
Cost allocation, product costing, fair cost allocation, activity allocation, valueadded activities
Keyword [sv]
Kostnadsfördelning, produktkalkylering, rättvis kostnadsfördelning, aktivitetsfördelning, värdeskapande aktiviteter
National Category
Production Engineering, Human Work Science and Ergonomics Engineering and Technology
Identifiers
URN: urn:nbn:se:mdh:diva-31858OAI: oai:DiVA.org:mdh-31858DiVA: diva2:936304
Subject / course
Product and Process Development
Supervisors
Examiners
Available from: 2016-06-17 Created: 2016-06-13 Last updated: 2016-06-17Bibliographically approved

Open Access in DiVA

Rättvisande priser(1755 kB)36 downloads
File information
File name FULLTEXT01.pdfFile size 1755 kBChecksum SHA-512
19b5d25126c67583f8453ca7be3bd03975963dfbc3e963be0f96b09ab03a2e7c77c7f4bb198f5c60e9d6bfad62572eaef89762ac2f7e3c5e6c7f1c9a0cadda1f
Type fulltextMimetype application/pdf

By organisation
School of Innovation, Design and Engineering
Production Engineering, Human Work Science and ErgonomicsEngineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 36 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 105 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf