mdh.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Spare parts management potential in production
Mälardalen University, School of Innovation, Design and Engineering. (maintenance)
2015 (English)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

Spare parts management (SPM) is an important branch of management which could lead the company to success or bankruptcy. It is also fill of potential improvements that can increase the company profits, productivity, and reliability. Wise inventory management would eliminate all the delay risks of unplanned breakdowns, and reduce process time and cost.

To understand the importance of the spare parts, a fundamental knowledge of maintenance types, spare parts, spare parts management, spare parts classifications, ABC analysis, Economic order quantity, suppliers’ management, purchase management, and management computer program SAP, have been viewed.

Companies realize the spare parts importance and try to develop the system to increase the benefits. Many ways has been taken to achieve that. Each company has it is own management system that the company has developed in years.

In this research, spare parts management system of seven companies has been studied. By comparing of the management systems, we highlight the areas that would have negative or positive impact on the system. We would also analysis why the companies have chosen these systems, how they develop the system, and where they aim throw the development.

Reviewing case studies would have many advantages, it would expand the vision to develop the management system and focus on the points that have permanent value instead of focus on temporary improvement.

Two check lists of points that could have potential improvement, have been presented and in which improvement type.

Place, publisher, year, edition, pages
2015. , 88 p.
Keyword [en]
spare parts, management, Maintenance, preventive maintenance, based conditions
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:mdh:diva-28877OAI: oai:DiVA.org:mdh-28877DiVA: diva2:852209
Subject / course
Product and Process Development
Presentation
2015-08-21, Rapson IDT, Smedjegatan 37 63105 Eskilstuna Sweden, Eskilstuna, 12:55 (English)
Supervisors
Examiners
Available from: 2015-09-10 Created: 2015-09-08 Last updated: 2015-09-10Bibliographically approved

Open Access in DiVA

fulltext(1296 kB)181 downloads
File information
File name FULLTEXT01.pdfFile size 1296 kBChecksum SHA-512
285ef001ae84fb295086680359fd5bc272f8722ab4993dbd872aec2055dbf0236f3625520b2e16b9e5ba1157a17b4122ef212f04f0f34baeea958ec73df4d2db
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Al-Bawi, Abbas
By organisation
School of Innovation, Design and Engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 181 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 300 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf