EFFEKTIVISERING AV BYGGLOGISTIK: TRANSPORT- OCH MATERIALFLÖDE: En fallstudie vid Årstastråket (Etapp 1) i Stockholm
Mälardalen University, School of Business, Society and Engineering.
2015 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

The purpose of this study is to examine how construction logistics work for the ongoing

project “Årstastråket” Stage 1, and to identify the logistics problems that the project may

have. The aim then is to find solutions to these problems in order to avoid them in the

upcoming projects. The study will include delopment of a standard template that can be used

in logistics planning of the project. At the beginning of the study a comprehensive literature

review of the available literature including reports and research articles was done to obtain a

deeper knowledge of the subject in question. The result of this study is based on conducted

case studies on the construction site, such as interviews and site visits. The majority of

collection in the case study was mainly collected from 11 site visits, which then was

supplemented with the information obtained from the interviews. The interviews were

conducted with the local manager and supervisor of the project at “Årstastråket” Stage 1. In

this study the construction logistics worked generally well, both in terms of transport- and

material flow at the construction site. The main logistics problems identified in “Årstastråket”

Stage 1 was particularly poor logistics planning of the project at an early stage, lack of visual

communication and constant updating of construction site plan alongside project developing.

The new developed standard template for logistics planning of the project at an early stage

can be used in order to achieve the established goals and make the project even more

effective.

Place, publisher, year, edition, pages
2015. , 57 p.
Series
Mälardalen Studies in Educational Sciences
Keyword [en]
Communications, logistics planning, material flow costs, production, temporary factory
Keyword [sv]
Materialflödeskostnader, produktionsprocess, Kommunikation, Logistikplanering, tillfälliga fabriken
National Category
Construction Management
Identifiers
URN: urn:nbn:se:mdh:diva-28607OAI: oai:DiVA.org:mdh-28607DiVA: diva2:841249
External cooperation
STRABAG Sverige
Subject / course
Building Engineering
Supervisors
Examiners
Available from: 2015-08-17 Created: 2015-07-11 Last updated: 2015-08-17Bibliographically approved

Open Access in DiVA

fulltext(2866 kB)234 downloads
File information
File name FULLTEXT01.pdfFile size 2866 kBChecksum SHA-512
9b4490def864e67480743e34bce395bc12eabe6057f51e4ac87d22e9c0d96b9e77eb22633098501f5777c111dc8af13b7abc8b0502fd7811083fac8b2158b8f7
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Basharkar, Wahidullah
By organisation
School of Business, Society and Engineering
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 234 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 430 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf