ENGINEERING CHANGE MANAGEMENT IN ENGINEERING-TO-ORDER PROJECTS FROM A MANUFACTURING PERSPECTIVE
Mälardalen University, School of Innovation, Design and Engineering, Innovation and Product Realisation.ORCID iD: 0000-0002-1224-792X
Mälardalen University, School of Innovation, Design and Engineering, Innovation and Product Realisation.ORCID iD: 0000-0002-0662-539X
Mälardalen University, School of Innovation, Design and Engineering, Innovation and Product Realisation.
2014 (English)In: 6th Swedish Production Symposium SPS'14, 2014Conference paper, Published paper (Refereed)
Abstract [en]

The purpose of this research was to investigate the engineering change management process in engineering-to-order projects while comparing the same process in traditional manufacturing. A single-case study at a engineering-to-order – engineering review office was performed and results were analysed in conjuction with literature covering the engineering change process in traditional manufacturing. Engineering-to-order projects and tradional manufacturing are different in many ways but share the need for a reliant engineering change process. This study found that engineering change management post-change analysis could benefit future projects in the form of quantifiable lessons learned from previous project’s engineering change data.

Place, publisher, year, edition, pages
2014.
Keyword [en]
Engineering Change Management, Engineering-to-Order and Process Management.
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:mdh:diva-26794OAI: oai:DiVA.org:mdh-26794DiVA: diva2:768415
Conference
6th Swedish Production Symposium SPS'14, 16-18 Sep 2014, Göteborg, Sweden
Available from: 2014-12-03 Created: 2014-12-02 Last updated: 2015-06-03Bibliographically approved
In thesis
1. Considering Engineering Change Management in Project Realisation: The Case of Offshore Platform Projects
Open this publication in new window or tab >>Considering Engineering Change Management in Project Realisation: The Case of Offshore Platform Projects
2015 (English)Licentiate thesis, comprehensive summary (Other academic)
Abstract [en]

Offshore wind converter platforms are complex installations that increase the competitiveness of offshore wind as an energy source. Prior research in the field of offshore platform project execution has focused on early project phases and planning as means to increase project reliability. Later phases such as fabrication, transport and installation have not received the same attention from academia and industry. Projects of this type frequently suffer both large and small deviations. The further projects progress, the more deviations they accumulate. The accumulated deviations have to be resolved in a timely manner so as to avoid impairing the quality and scheduling of an overall project. This research explores the design of converter platforms and the management of engineering change in relation to fabrication, transport and installation in order to increase the overall reliability of projects.

Two offshore platform projects in three case studies form the source of empirical data. The first of the three studies considered prior research connected to fabrication and installation of offshore platforms. In the second study, the effect of two different platform designs on the fabrication and installation process was investigated. The third study considered engineering change management as a tool to achieve changeability, and examined its ability to buffer against deviations affecting later project phases i.e. fabrication, transport and installation. The findings revealed that the design’s effects on a project’s outcome are often not the driver of reliability. Rather, it was found that engineering change management is essential to any project to manage the changeable nature of projects. This research also raises concerns as to how much engineering change to allow for and in what project phase. That engineering change, as a tool, should preferably be used sparingly in early phases and as necessary in later phases. The observed engineering change process in the studied projects was chaotic.  This research suggests that engineering change can be organised around change carriers. In this way, it is predicted that the processes of change can become more stable and predictable. 

Place, publisher, year, edition, pages
Västerås: Mälardalen University, 2015
Series
Mälardalen University Press Licentiate Theses, ISSN 1651-9256 ; 212
National Category
Production Engineering, Human Work Science and Ergonomics
Identifiers
urn:nbn:se:mdh:diva-28057 (URN)978-91-7485-217-2 (ISBN)
Presentation
2015-08-20, Filen, Mälardalens högskola, Eskilstuna, 10:15 (English)
Opponent
Supervisors
Funder
Knowledge Foundation
Available from: 2015-06-03 Created: 2015-06-02 Last updated: 2015-07-09Bibliographically approved

Open Access in DiVA

No full text

Search in DiVA

By author/editor
Sjögren, PeterBellgran, MonicaFagerström, Björn
By organisation
Innovation and Product Realisation
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar

Total: 78 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf