https://www.mdu.se/

mdu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
The evolution of a performance measurement system: an empirical investigation of a manufacturing organisation
Mälardalen University, School of Innovation, Design and Engineering. (IPR)
Mälardalen University, School of Innovation, Design and Engineering. (IPR)ORCID iD: 0000-0002-3530-2266
2012 (English)Conference paper, Published paper (Refereed)
Place, publisher, year, edition, pages
2012.
National Category
Engineering and Technology
Research subject
Innovation and Design
Identifiers
URN: urn:nbn:se:mdh:diva-17363OAI: oai:DiVA.org:mdh-17363DiVA, id: diva2:579694
Conference
PMA 2012 Conference, Performance management: From strategy to delivery, 11-13 July 2012, Fitzwilliam College, University of Cambridge, UK
Funder
XPRES - Initiative for excellence in production researchAvailable from: 2012-12-20 Created: 2012-12-20 Last updated: 2013-12-03Bibliographically approved
In thesis
1. Managing change in performance measures within a manufacturing context
Open this publication in new window or tab >>Managing change in performance measures within a manufacturing context
2013 (English)Doctoral thesis, comprehensive summary (Other academic)
Abstract [en]

Even though the literature available within the field of performance measurement and management (PMM) is extensive, a gap exists regarding how change is managed in performance measures (PM).  This gap is corroborated by the empirical data underlining that only a few organisations have mechanisms in place for managing PM change. The need to manage change in PM arises from the consensus that performance measurement systems (PMS) should reflect the strategy and direct environments of the company. As both strategies and environments are dynamic in nature the PMS ought to possess the capability to change. The paradox of combining dynamic strategies and environments with static PMS has created problems for companies as the competitive conditions change over time. With this background in mind, the purpose of this thesis is to contribute to the existing body of knowledge regarding how to manage change in performance measures. The contribution from this research will stem from analysis of six empirical studies and the results will be concluded in a set of guidelines regarding how to manage change in PM in practice.

This thesis has adopted a systems perspective and takes a qualitative, case-study based approach. In total six case studies and three literature studies have been conducted. The case studies have been conducted on three different continents and have focused on the deployed ways for managing change in PM and how the PM have evolved over time. The first literature study focused on the general literature within the field of PMM, the second literature study focused on the literature revolving around keeping PM updated and relevant over time whilst the third and concluding literature study focused on further expanding the theoretical base on how to manage change in PM and how PM evolve and change after their implementation. This thesis concludes that extensive PM change is necessary over time in order to establish and maintain appropriate PM, continuously improve the measurement process and boost performance. Further, in converse to the various approaches suggested in literature, all six approaches identified in the case studies are processes. Furthermore, each PM change process differs from another as highlighted in the empirical findings chapter.

Finally, 11 factors have been identified from the theoretical and empirical findings that affect the ability to manage change in PM: level of process documentation, process ownership, employee involvement and alignment (as an embedded part of the PM change process design), communication, culture, role of top-management, IT-infrastructure capabilities, resources available for facilitation, PM ownership and education. Finally, eight guidelines have been developed addressing how to manage change in performance measures.

Place, publisher, year, edition, pages
Västerås: Mälardalen University, 2013
Series
Mälardalen University Press Dissertations, ISSN 1651-4238 ; 141
Keywords
performance measures
National Category
Engineering and Technology
Research subject
Innovation and Design
Identifiers
urn:nbn:se:mdh:diva-18691 (URN)978-91-7485-107-6 (ISBN)
Public defence
2013-06-14, Filen, Smedjegatan 37, Eskilstuna, 10:00 (English)
Opponent
Supervisors
Funder
XPRES - Initiative for excellence in production research
Available from: 2013-04-29 Created: 2013-03-28 Last updated: 2013-12-06Bibliographically approved

Open Access in DiVA

No full text in DiVA

Authority records

Cedergren, Stefan

Search in DiVA

By author/editor
Salloum, MohammedCedergren, Stefan
By organisation
School of Innovation, Design and Engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 75 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf