https://www.mdu.se/

mdu.sePublications
Planned maintenance
A system upgrade is planned for 10/12-2024, at 12:00-13:00. During this time DiVA will be unavailable.
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Pull Production System Improvements: Pull Production System Improvements In GKN Driveline AB
Mälardalen University, School of Innovation, Design and Engineering.
2012 (English)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

As the effort of today’s industries to continuously move towards lean production, pull production system has been developed as one possible solution of lean. It is popularly known in the industry world, and is indeed a proven technique to achieve substantial savings on inventory, production cost incurred by manufactures all over the world. However, a careful understanding of pull production systems is required to access its suitability to a particular production setup. It is necessary to develop a proper way to implement pull production systems.

           

This study is based on a real life scenario in a leading driveline manufacturing company. The production system is studied in detail as regard to its production characteristic. A theoretical review is first made as research foundation. A careful analysis study within the company is conducted with all the existing constrains to figure out improvement opportunities. Eventually, from the applicability point of view, proposals of future pull production system implementation have been developed. The objective of the proposals is to minimize the identified weaknesses of the current system, including long lead time, low flexibility and unconnected flow.

Place, publisher, year, edition, pages
2012. , p. 60
Keywords [en]
Lean, Pull production system, Push production system, Heijunka, Leveling, Kanban, CONWIP, Takt time, Pacemaker, FIFO, Supermarket.
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:mdh:diva-16545OAI: oai:DiVA.org:mdh-16545DiVA, id: diva2:577307
External cooperation
GKN Driveline AB
Subject / course
Product and Process Development
Presentation
2012-03-30, 08:15 (English)
Uppsok
Technology
Supervisors
Examiners
Available from: 2013-02-04 Created: 2012-12-14 Last updated: 2013-02-04Bibliographically approved

Open Access in DiVA

xiaogkn(2191 kB)3034 downloads
File information
File name FULLTEXT01.pdfFile size 2191 kBChecksum SHA-512
264880aa6d234b707ff3f420201dcad6f351d40b6ea6932aa87369a669878e724d9fec6728adb2b78af52220c96ef65f3476f4ee552617df209e7c7a78c21fc0
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Wang, Xiaoyan
By organisation
School of Innovation, Design and Engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 3045 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 565 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf