https://www.mdu.se/

mdu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Development of Production Concept: Process development at ABB Control Products with focus on generating new production concept
Mälardalen University, School of Innovation, Design and Engineering.
Mälardalen University, School of Innovation, Design and Engineering.
2012 (English)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

This Master thesis is within the area of innovative production. The authors are Master students at Mälardalen University in the field of production and process development. The purpose of the thesis is to design a production development process and to apply it in the case study performed at ABB Control Products in Västerås, Sweden. The new production concept developed is needed due to several changes in production of large size contactors that will take place during 2012; a new product size will be introduced, a new design of current products will be implemented, and production capacity for future increasing demands must be investigated.

The approach to generate the production concept has been based on theoretical methods and models with focus on the lean philosophy.

Through the theoretical framework a process for production development has been designed with the stages;

Planning and Preparation, Current State Analyze, Concept Generation, Concept Analyze and Selection, and Visualization of Concept. The outcome of the thesis project is a mapping and disturbance analyze of current production, and a new production concept with an automation solution and a new balancing of the production line included. Finally the new production concept has been visualized in a 3D-simulation model.

The main differences of the new production concept compared to current production is that conveyors are used as transportation system through the entire production process and two parallel flows is used in the production line in aim to shorten the lead time.

Place, publisher, year, edition, pages
2012. , p. 94
Keywords [en]
Production Development, Production Concept, Lean, Process Development
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:mdh:diva-14870OAI: oai:DiVA.org:mdh-14870DiVA, id: diva2:536736
Subject / course
Product and Process Development
Uppsok
Technology
Supervisors
Examiners
Available from: 2012-09-19 Created: 2012-06-24 Last updated: 2012-09-19Bibliographically approved

Open Access in DiVA

fulltext(2425 kB)3818 downloads
File information
File name FULLTEXT01.pdfFile size 2425 kBChecksum SHA-512
0534e5b4b81700134e75d88d58d0d21820f72e4ff1496d9605b167f5899a431f823fdb03a856969596602665ed08e17adc3f53cb6cd16333d149f939137acf9e
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Anderstig, SandraEklund, Daniel
By organisation
School of Innovation, Design and Engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 3818 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 928 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf