mdh.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Energieffektivisering i verkstadsindustri: Tillämpning hos LEAX Mekaniska AB i Köping
Mälardalen University, School of Sustainable Development of Society and Technology.
2011 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Energieffektivisering är en av möjligheterna att överväga för att nå ett medvetet, hållbart och modernt samhälle. Begreppet är sedan länge myntat inom sektorerna bostäder och kontor, men har inte riktigt nått lika långt inom industrisektorn än; även om potentialen för effektivisering är minst lika vanligt förekommande där.

LEAX Mekaniska AB i Köping, som är ett verkstadsindustriföretag specialinriktat på fordonskomponenter till den tunga fordonsindustrin, har förstått potentialen som finns tillgänglig när det gäller effektivare energianvändning. Efter att tidigare ha utfört lättare mätningar och beräkningar själva så har de nu valt att initierat ett examensarbete som har som syfte att utreda möjligheten att återvinna spillvärme från de egna processerna, och att via en värmepumpanläggning uppgradera värmen så att den kan utnyttjas för uppvärmning av de egna lokalerna istället. I dagsläget kyls spillvärmen bort via en kylvattenkrets kopplad till ett kyltorn på taket.

I aktuell rapport presenteras först teorier och metoder kring energieffektivisering och energiåtervinning. Sedan presenteras grunderna om termiska processer och värmepumpanläggningar. Slutligen presenteras själva tillämpningen hos LEAX Mekaniska AB.

Utredningen visar att den potentiella effekten som kan utnyttjas till förångning i en värmepumpanläggning istället för att kylas bort på taket är i storleksordningen 170 kW. Med en kompressordriven värmepump bör effekten gå att uppgradera till närmare 230 kW enligt beräkningar utförda i datorprogrammet CoolPack. Den uppskattade investeringen för installationen och besparingen den åstadkommer beräknas sedan, och återbetalningstiden för investeringen beräknas. I och med den aktuella utredningen så blir återbetalningstiden cirka 4 år och 9 månader (4,77 år).

Abstract [en]

Energy efficiency is one of the possibilities to consider in order to reach a conscious, sustainable and modern society. The concept of energy efficiency has long been used in sectors such as homes and offices, but has not quite reached the same widespread use in the industry yet; though the potential for efficiency is at least as commonly available there. LEAX Mechanical AB in Köping, Sweden, is an engineering company specialized on vehicle components for the heavy vehicle industry, and has recently understood the potential that is available in more efficient energy utilization. Having previously performed minor measurements and calculations themselves, LEAX have now chosen to initiate a thesis that aims to investigate the possibility of recovering waste heat from its own processes, and then using a heat pump system to upgrade the heat so that it can be used for heating in the buildings heat delivery system instead. The current situation is that the waste heat from the applications is removed through a cooling circuit connected to a cooling tower on the roof of the building. The current report first presents theories and methods on energy efficiency and energy recovery applications. Then the basics of thermal processes and heat pumps are introduced. Towards the end of the report, the application investigated at LEAX Mechanical AB is presented. The investigation shows that the potential power that can be exploited for evaporation in a heat pump plant instead of being cooled off on the roof is of the order of 170 kW. With a compressor-driven heat pump, the condensing power should be able to reach a value around 230 kW according to calculations done in the computer program CoolPack. The estimated investment for the installation and the savings it produces is then calculated, and the payback period for the estimated investment is calculated. The current investigation gives a payback time of 4 years and a little more than 9 months (4.77 years).

Place, publisher, year, edition, pages
2011. , 74 p.
Keyword [en]
Energy efficiency, heat recovey, mechanical engineering, haet pump, payback time
Keyword [sv]
Energieffektivitet, energiåtervinning, verkstadsindustri, värmepump, återbetalning
National Category
Energy Engineering
Identifiers
URN: urn:nbn:se:mdh:diva-12617OAI: oai:DiVA.org:mdh-12617DiVA: diva2:425945
Subject / course
Energy Engineering
Presentation
2011-06-10, Ypsilon, Mälardalens högskola, Box 883, 721 23 Västerås, Västerås, 14:15 (Swedish)
Uppsok
Technology
Supervisors
Examiners
Available from: 2011-06-29 Created: 2011-06-22 Last updated: 2011-06-29Bibliographically approved

Open Access in DiVA

No full text

Search in DiVA

By author/editor
Gyllhag, Jacob
By organisation
School of Sustainable Development of Society and Technology
Energy Engineering

Search outside of DiVA

GoogleGoogle Scholar

Total: 201 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf