https://www.mdu.se/

mdu.sePublications
System disruptions
We are currently experiencing disruptions on the search portals due to high traffic. We are working to resolve the issue, you may temporarily encounter an error message.
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Identification and Ranking of Factors Affecting the Delay Risk of High-Rise Construction Projects Using AHP and VIKOR Methods
Sadjad Univ Technol, Dept Civil Engn, Mashhad 9188148848, Iran.;Assoc Talent Liberty Technol TULTECH, EE-10615 Tallinn, Estonia..
Tech Univ Liberec, Fac Mechatron Informat & Interdisciplinary Studies, Liberec 46117, Czech Republic.;Tech Univ Liberec, Inst Nanomat Adv Technol & Innovat, Liberec 46117, Czech Republic..ORCID iD: 0000-0003-1987-5790
Assoc Talent Liberty Technol TULTECH, EE-10615 Tallinn, Estonia..
Sadjad Univ Technol, Dept Civil Engn, Mashhad 9188148848, Iran..
Show others and affiliations
2024 (English)In: INFRASTRUCTURES, ISSN 2412-3811, Vol. 9, no 2, article id 24Article in journal (Refereed) Published
Abstract [en]

Construction projects, especially those for commercial purposes, require thorough planning and control to ensure success within predetermined budgets and timelines. This research, conducted in Mashhad, Iran, employs the analytic hierarchy process (AHP) and VIKOR methods to identify and rank factors influencing delays in high-rise projects. The study, based on a sample of 40 projects, emphasizes the comprehensive nature of our research method. The scale for features in project selection includes societal importance (with different applications including cultural hubs, affordable housing initiatives, and urban renewal for social equity), size (less and more than 20 units in residential projects), and diversity (mixed-use development, inclusive infrastructure, and cultural and recreational spaces), contributing to a comprehensive analysis of construction delays. Expert project managers and engineers provided insights through two questionnaires, and their responses underwent thorough analysis. Our findings not only underscore the significance of factors contributing to project success but also rank their impact on the likelihood of delays. The study reveals that the negative effects of these factors on cost, time, and project quality vary. Time emerges as the most influential parameter, with approximately six times more impact on cost and nine times more on quality. Contractor financial weakness, delays in allocating financial and credit resources, insufficient project resource allocation, contractor technical and executive weakness, and a lack of proper implementation and project control are identified as the most important factors contributing to delays.

Place, publisher, year, edition, pages
MDPI , 2024. Vol. 9, no 2, article id 24
Keywords [en]
project delay, time management, quality management, analytical hierarchy process (AHP), VIKOR
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:mdh:diva-66241DOI: 10.3390/infrastructures9020024ISI: 001169884000001Scopus ID: 2-s2.0-85187250429OAI: oai:DiVA.org:mdh-66241DiVA, id: diva2:1844183
Available from: 2024-03-13 Created: 2024-03-13 Last updated: 2024-03-20Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records

Vadiee, Amir

Search in DiVA

By author/editor
Gheibi, MohammadMoezzi, RezaVadiee, Amir
By organisation
Future Energy Center
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 91 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf