https://www.mdu.se/

mdu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Asynchronous multi-rate method of real-time simulation for active distribution networks
Tianjin Univ, Minist Educ, Key Lab Smart Grid, Tianjin 300072, Peoples R China..
Tianjin Univ, Minist Educ, Key Lab Smart Grid, Tianjin 300072, Peoples R China..
Tianjin Univ, Minist Educ, Key Lab Smart Grid, Tianjin 300072, Peoples R China..
Tianjin Univ, Minist Educ, Key Lab Smart Grid, Tianjin 300072, Peoples R China..
Show others and affiliations
2023 (English)In: IET Renewable Power Generation, ISSN 1752-1416, E-ISSN 1752-1424, no 1, p. 150-161Article in journal (Refereed) Published
Abstract [en]

The real-time simulation of active distribution networks (ADNs) can provide an accurate insight into transient behaviours, but faces challenges in simulation efficiency and flexibility brought by larger system scales and wider time-scale ranges. This paper presents an asynchronous multi-rate (AMR) method and design for the real-time simulation of large-scale ADNs. In the proposed method, the entire ADN was decoupled into different subsystems according to accuracy requirements, and optimized time-steps were allocated to each subsystem to realize a fully distributed simulation. This not only alleviated the time-step coordination problem existing in multi-rate real-time simulations, but also enhanced the flexible expansion capabilities of the real-time simulator. To realize the AMR real-time simulation, a multi-rate interfacing method, synchronization mechanism, and data communication strategy are proposed in this paper, and their hardware design is also presented in detail. A modified IEEE 123-node system with photovoltaics and wind turbine generators was simulated on a 3 field-programmable gate arrays (FPGAs)-based AMR real-time simulator. The real-time results were captured by the oscilloscope and verified with PSCAD/EMTDC, which demonstrated the superiority in simulation flexibility and accuracy compared with the synchronous multi-rate (SMR) method.

Place, publisher, year, edition, pages
INST ENGINEERING TECHNOLOGY-IET , 2023. no 1, p. 150-161
National Category
Telecommunications
Identifiers
URN: urn:nbn:se:mdh:diva-58299DOI: 10.1049/rpg2.12500ISI: 000794137700001Scopus ID: 2-s2.0-85129882531OAI: oai:DiVA.org:mdh-58299DiVA, id: diva2:1661143
Available from: 2022-05-25 Created: 2022-05-25 Last updated: 2025-01-13Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records

Yan, Jinyue

Search in DiVA

By author/editor
Yan, Jinyue
By organisation
Future Energy Center
In the same journal
IET Renewable Power Generation
Telecommunications

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 63 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf