https://www.mdu.se/

mdu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
LEAN CONSTRUCTION: En studie av Heby vårdboende
Mälardalen University, School of Business, Society and Engineering.
Mälardalen University, School of Business, Society and Engineering.
2022 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

Most construction companies want to deliver the best possible results for their customers while spending the least possible resources. Nevertheless, the construction industry has traditionally been full of unnecessary inefficiency regarding workflows. One of the most successful methods to prevent inefficiency workflow is lean construction. Lean construction consists of various methods that aim to streamline workflow as optimally as possible. Purpose: The purpose of the degree project is to use specific lean methods and tools to identify different waste and be able to use them to reduce downtime of a studied construction project. Method: A case study has been carried out where the project Heby - care homes has been studied. To gather more information a survey study has been done. To gather even further information about the project an interview was conducted with a person who has a leading role. Results: The result shows a analysis of the survey and the interviewe answers. It also includs working methods, transparency and waste minimization. Furthermore it includs solutions like identify problems, create order and structure, standardize and work on improvements. Conclusions: The conclusion that can be drawn is that standardizations in the form of checklists and guides need to be in each project. More openness and to review your chosen forms of agreement. To have a more dynamic working group that strives to achieve common goals and continuous improvements. These are the most important aspects of making a project effective.

Place, publisher, year, edition, pages
2022. , p. 48
Keywords [en]
Lean contraction, Lean, Just in time, Lead time, Kaizen, 5s, Efficiency.
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:mdh:diva-58215OAI: oai:DiVA.org:mdh-58215DiVA, id: diva2:1657964
Subject / course
Building Engineering
Presentation
2021-12-13, Online-Zoom, Online-Zoom, Västerås, 13:35 (Swedish)
Supervisors
Examiners
Available from: 2022-05-28 Created: 2022-05-12 Last updated: 2022-05-28Bibliographically approved

Open Access in DiVA

No full text in DiVA

Search in DiVA

By author/editor
Abdelwahab, ZeidAl Choueyri, Maroun
By organisation
School of Business, Society and Engineering
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 350 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf