FORMSÄTTNING AV HÖGA PLATSGJUTNA BETONGKOSTRUKTIONER: Undersökning av diverse klättersystem samt alternativa lösningar för silo-projektet Gråbergsutfrakt i Kiruna
Mälardalen University, School of Business, Society and Engineering.
2020 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

Today construction industry is building higher and more complicated constructions than ever thanks to the advancements in materials, technical knowledge and methodologies. One important material is concrete, which has been used to create impressive architectural marvels. This dissertation aims to examine the differences between climbing and slip formwork systems for tall concrete structures that require several pouring steps in height. The main differences noted between both systems are formwork configuration, assembly and cycling of the formwork and climbing elements, price and quantity of material, labor required, the quality of the finished structure and safety during construction. A case study was investigated with the help of formwork supplier PERI Sverige AB and nordic contractor PEAB AB regarding a 20,5 meter high reinforced concrete silo located in a mining complex in Kiruna, Sweden. Through a review of the existing literature in the subject, interviews with experts in the topic and the outcome from the project case study, the results shows that while the SCS climbing system from PERI Sverige AB required more working days compared to a slip formwork system, it was chosen as a more appropriate solution for this project in combination with the crane at the jobsite, due to the amount of labor required, safety and overall cost of it. In conclusion, the selection of the SCS climbing system as formwork system proved to be the most adequate solution for the case study when critical aspects such as assembly and cycling of formwork, price and safety were evaluated.

Place, publisher, year, edition, pages
2020. , p. 107
Keywords [en]
Formwork, climbing formwork, slipping formwork, silo building
Keywords [sv]
Formsättning, klättersystem, glidsystem, silobyggnation
National Category
Building Technologies Construction Management
Identifiers
URN: urn:nbn:se:mdh:diva-49300OAI: oai:DiVA.org:mdh-49300DiVA, id: diva2:1451493
Subject / course
Building Engineering
Supervisors
Examiners
Available from: 2020-07-03 Created: 2020-07-02 Last updated: 2020-07-03Bibliographically approved

Open Access in DiVA

fulltext(22921 kB)706 downloads
File information
File name FULLTEXT01.pdfFile size 22921 kBChecksum SHA-512
79c71af203cab8246210978280054d4acec55274af0c2d4d430de3bd5b7b2e303c8dd14a4b8bfef8b180c014be46e82c313b1c56c6e0fc342aa1f87b4f8fb77b
Type fulltextMimetype application/pdf

By organisation
School of Business, Society and Engineering
Building TechnologiesConstruction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 707 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 417 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf