https://www.mdu.se/

mdu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Arbetsplatsdispositionsplan: Förslag på APD-plan vid ombyggnationen av Stora torget och Bondtorget i Västerås
Mälardalen University, School of Business, Society and Engineering.
Mälardalen University, School of Business, Society and Engineering.
2020 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

For many years, an intense debate has been going on in Sweden about the fact that construction costs are too high. A contributing reason for increased construction costs is believed to be due to inefficient production from most parties who add no value to the final production. Several studies indicate that there are opportunities for a more efficient construction process through carefully designed and improved construction logistics. Wellplanned construction logistics contribute to a well-functioning construction site, which contributes to reduced time wastage. The purpose of this thesis is to bring forth suggestions for an APD-plan with associated stage division and building logic solution for the future reconstruction of the plazas Stora torget and Bondtorget. Good planning that must take time is required for a well-thought-out rebuild. This contributes to reduced costs for unforeseen events and reduces construction time. To facilitate the reconstruction of Stora torget and Bondtorget, the reconstruction can be done in three stages. Stage division contributes to the redevelopment of the plaza with least disruption for the workers and for people who will be around the plaza. Just-in-time method is a good working method at orders as it helps to deliver the correct material at the right time and in the right place. It contributes to a low resource and efficient production

Place, publisher, year, edition, pages
2020.
Keywords [en]
APD-plan, construction logistics, segment, just-in-time, communication, reconstruction, plaza
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:mdh:diva-47220OAI: oai:DiVA.org:mdh-47220DiVA, id: diva2:1412092
Subject / course
Building Engineering
Supervisors
Examiners
Available from: 2020-03-12 Created: 2020-03-05 Last updated: 2020-03-12Bibliographically approved

Open Access in DiVA

fulltext(1749 kB)811 downloads
File information
File name FULLTEXT01.pdfFile size 1749 kBChecksum SHA-512
ad00d3782eae2a69efd6c8bd3a3c859c5ecba94d3a31476a99383f9ea0d4bd9f43fb5d3ed9062d442af29ce0f39974d49598ed4bfdac2f241617d4d1ef794988
Type fulltextMimetype application/pdf

By organisation
School of Business, Society and Engineering
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 811 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 479 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf