mdh.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Byggnadsinformationsmodellering (BIM) i praktiken: En studie av BIM i praktiken hos Peab Bygg Öst 1
Mälardalen University, School of Business, Society and Engineering.
2018 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Detta examensarbete skrevs under höstterminen 2014 i samarbete med Peab region Bygg Öst 1 i Stockholm och syftar till att utreda hur dem arbetar med BIM i praktiken.

Examensarbetaren fördjupar sig i ämnesområdet BIM och hur användningen av den 3D tekniken kan se ut i praktiken i arbetslivet.

För att avgränsa arbetet skrevs det om byggnadsinformationsmodellering  BIM, vid tre skeden i byggprocessen, anbud- och kalkylskede, projektering, produktion samt visualisering som sker vid olika tillfällen under hela byggprocessen. Arbetet innehåller även en redogörelse för investering av 3D skrivare hos Peab Bygg Öst 1, syftet med investeringen är bland annat för att utveckla ett arbetssätt med 3D teknik och visualiseringar framöver. Anledningen till att arbetet behandlar olika skeden är för att erhålla bred inblick och förståelse om ämnesområdet. Rapporten behandlar frågeställningar som syftar till att identifiera BIM som teknik och arbetssätt, hur Bygg Öst 1 arbetar med BIM i praktiken samt hur man vill arbeta med det framöver. Arbetet innehåller även redovisning av ett internt projekt som examensarbetaren utförde hos företaget. Interna projektet syftar till att utveckla anbud och kalkylskedet med BIM.

Arbetet är baserat på studier i ämnet samt platsbesök på projekt inom Bygg Öst 1. Resultaten som erhölls från intervjustudierna visar hur man arbetar med BIM vid de olika pågående projekten för bland annat kollisionshantering, arbetsberedningar samt olika typer av visualiseringar med mera. Sammanfattningsvis syftar BIM till att effektivisera, såsom att reducera eventuellt uppkommande fel och säkerställa moment i byggprocessen.

En jämförelse av litteratur- och intervjustudierna medförde förståelse för ämnesområdets användningsområden och omfattning. BIM är ett brett ämnesområde och det praktiska tillvägagångssättet med 3D tekniken kan tillämpas på olika sätt hos ett företag, vilket kan vara beroende av ambition och arbetssätt hos företaget. När man implementerar BIM i arbetssättet medför det inte direkta lösningar eller strategier att tillämpa i ett företag, utan implementeringen av BIM i arbetssättet kommer med utmaningar. På grund av ämnesområdets omfattning kan det vara viktigt att man har specifika mål och en tydlig bild om vad som vill uppnås med resultatet av implementeringen i arbetssättet. Det är även viktigt att veta hur mycket inverkan resultatet kommer ha på tids- eller ekonomiska besparingar. På så sätt är det möjligt att erhålla förståelse om hur implementeringen av tekniken kan ske och vilka vinningar som kan erhållas.

Abstract [en]

This thesis was written during the autumn term 2014 in cooperation with Peab region Bygg Öst 1 in Stockholm. The writing aims to investigate how they work with Building Information Modeling, BIM, in practice and increase understanding in how you can use the 3D technology in the professional working life.

In order to define the thesis it has been written about three stages in the construction process: offer- and costing stage (construction bidding), projecting (preconstruction phase) and production (construction execution). Besides that the thesis also includes how BIM is used for visualization of the project and a report containing an investment of 3D printer has also been fulfilled. Additionally, the thesis also contains a description of an internal project that the writer has performed in the company. The internal project aims to develop the offer- and costing stage with BIM.

The writing is based on studies on the subject and visits to some of Bygg Öst 1 ongoing projects. Results from the interview studies indicate that Peab Bygg Öst 1 in Stockholm is working with BIM for example collision handlings, preparation for big parts in the production, different types of visualizations and more. In short, the technology is used for ensuring the occasions in the construction process to improve the efficiency.

The comparing of the literature and the interview study led to an understanding of the field of the subject and how wide it is. BIM is a broad topic and this 3D technology can be applied in work methods in different ways. The technique does not provide ready-made solutions or strategies to implement in a company, it has been learned that the implementation comes with some challenges.

Because the technique is broad it may be beneficial that there are specific goals about what should be achieved in the result of the implementation of BIM in the construction process in order to ensure what achievements obtained with the help of the technology.

Place, publisher, year, edition, pages
2018. , p. 83
Keywords [en]
BIM, construction bidding, preconstruction phase, construction execution, visualization, 3D printer, efficiency, implementation.
Keywords [sv]
BIM, anbud- och kalkylskede, projektering, produktion, visualisering, 3D skrivare, effektivisering, implementering.
National Category
Engineering and Technology Civil Engineering Environmental Analysis and Construction Information Technology
Identifiers
URN: urn:nbn:se:mdh:diva-39739OAI: oai:DiVA.org:mdh-39739DiVA, id: diva2:1216424
External cooperation
Peab Bygg Öst 1, Solna.
Subject / course
Building Engineering
Supervisors
Examiners
Available from: 2018-06-18 Created: 2018-06-11 Last updated: 2018-06-18Bibliographically approved

Open Access in DiVA

Examensarbete - BIM i praktiken(3943 kB)9 downloads
File information
File name FULLTEXT01.pdfFile size 3943 kBChecksum SHA-512
a2888974e9cf84fda2bbf59c450c86fb056b8f00fea68cfa04b760060c99fd28dcb322906ae36cd6f9b76d4415deca948aec668fc3d5f5f3d687a92f678835f8
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Pinto Dias dos Santos, Hewan Nayoli
By organisation
School of Business, Society and Engineering
Engineering and TechnologyCivil EngineeringEnvironmental Analysis and Construction Information Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 9 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 11 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf