mdh.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Dimensionering av pelletspanna: Ångkartläggning och dimensionering av en ny pelletspanna hos Fresenius Kabi i Kungsängen
Mälardalen University, School of Business, Society and Engineering.
2018 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

The current boilers at the Brunna plant were installed in 1979 using oil and solvents to produce steam for the production and heating of the plant. To reduce the carbon dioxide emissions in compliance with Fresenius Kabi strategy a new biofuel boiler is about to be installed. Since the steam demand has been reduced during the years and it’s expensive to install a new boiler this study has been performed to calculate the actual steam demand for the plant at different scenarios. A smaller boiler requires a lower investment, achieves higher efficency and contributes to reduced carbon dioxide emissions. This report is intended to supply the management with information so that a decision regarding investments and employees can be made. The result is presented as different possible scenarios that are of great importance when deciding which boiler effect that is needed. Destillation, heating and the production have a major impact and must be considered when installing a new boiler. The results show that a boiler should be between 2-4 MW net effect depending on which scenario that is most likely to occur.

Place, publisher, year, edition, pages
2018. , p. 33
Keywords [en]
Boiler, duration diagram, biofuel, optimization, energy saving, pellets
Keywords [sv]
Panna, varaktighetsdiagram, biobränsle, optimering, energieffektivisering, pellets
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:mdh:diva-39016OAI: oai:DiVA.org:mdh-39016DiVA, id: diva2:1198655
External cooperation
Fresenius Kabi
Subject / course
Energy Engineering
Supervisors
Examiners
Available from: 2018-06-05 Created: 2018-04-18 Last updated: 2018-06-05Bibliographically approved

Open Access in DiVA

fulltext(1064 kB)3 downloads
File information
File name FULLTEXT01.pdfFile size 1064 kBChecksum SHA-512
0470e59526800f981e5671e1b5a516eecbe296d77fadbb4a92ceaaac105dd65d5bc867363e8964a674f846050b1af30885664fe8b46552fb5973e3b4fa6fe6c2
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Forsström Skeppar, Joacim
By organisation
School of Business, Society and Engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 3 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 26 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf