mdh.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Ytterväggar för nybyggnation av modulhus: Hur påverkar valet av yttervägg installation och kostnader för modulhus
Mälardalen University, School of Business, Society and Engineering.
Mälardalen University, School of Business, Society and Engineering.
2017 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

This work aims at identifying and proposing four prefabricated exterior wall elements to a company that will build small prefabricated houses where the house elements are produced in a Micro factory. The four wall elements are as follows: Corner wall units, wall elements with no cut-out for windows and doors, wall elements with cut-out for a window and door and wall elements with cut-out for a door. In this report four different prefabricated outer wall elements have been proposed for small housing project. A comparison study has been made between three different wall solutions (Outer wall solution two has been proposed by the students themselves as well as outer wall solution one and three from two different building suppliers, Isover and Paroc.) to ensure which of these walls fits the best for the four prefabrication element drawings. The main difference between the walls solutions mentioned above is that outer wall solution two has one thick layer of insulation with light beam rails and outer wall solution one and three has massive tree beams in them with separated insulation layers. The advantage of light rails compared to massive rails in outer walls is that the thermal bridges are minimized due to the fact that there are not as much exposed joints in the outer wall with light rails. One more big difference is that the U-value's differ between the three outer-wall solutions. Since the materials are different in the three outer-walls the sound insulation and fire protection characteristics also differ. The sound insulation and fire protection ability depends mainly on the amount of plaster boards and type of insulation in the wall. Outer wall solution two has been chosen for the house project and it will be the head characteristic wall ahead in this report. Outer wall Option Two) was chosen for the project. It was chosen due to following criteria's: low energy needs for active heating, low manufacturing costs, low U-value, low construction weight, good moist resistance, good sound reduction and high fire protection class.

Place, publisher, year, edition, pages
2017. , p. 84
Keyword [en]
Prefabrication, Small House, Construction, Heating-insulation, Outer Walls, Moist transport, Moistdamage, Energyneeds.
Keyword [sv]
Prefabrikation, Prefab, Småhus, Konstruktion, Värmeisolering, Yttervägg, Fukttransport, Fuktskador, Energibehov.
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:mdh:diva-36330OAI: oai:DiVA.org:mdh-36330DiVA, id: diva2:1138321
Subject / course
Building Engineering
Presentation
2016-06-13, Västerås, 11:00 (Swedish)
Supervisors
Examiners
Available from: 2017-09-05 Created: 2017-09-04 Last updated: 2017-09-05Bibliographically approved

Open Access in DiVA

Ytterväggar för nybyggnation av modulhus(2536 kB)54 downloads
File information
File name FULLTEXT01.pdfFile size 2536 kBChecksum SHA-512
4a1eb65079b5cd2b2b23eb0c895d4f67e96c9c52f2ba55c2f16a80362616881c8db07e874bbb63c9c3053eab72ef1f11cce44138a0632019ca1068ec8039154b
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Mohsin, Nooraldeen
By organisation
School of Business, Society and Engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 54 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 106 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf