Räddningsinsats i tunnelmiljö: Fullskaleförsök i Tistbrottet, Sala
Mälardalens högskola, Akademin för ekonomi, samhälle och teknik, Framtidens energi. (Future Energy)ORCID-id: 0000-0002-9598-0958
Mälardalens högskola, Akademin för ekonomi, samhälle och teknik, Framtidens energi. Storstockholms brandförsvar .ORCID-id: 0000-0001-5858-4377
Södra Älvsborgs Räddningstjänstförbund.
Mälardalens högskola, Akademin för ekonomi, samhälle och teknik, Framtidens energi. (Future Energy)ORCID-id: 0000-0001-6758-6067
Vise andre og tillknytning
2014 (svensk)Rapport (Annet vitenskapelig)
Abstract [sv]

I oktober 2013 genomfördes sex fullskaliga brandförsök med kombinerat förflyttnings och släckmoment i Björka Minerals dolomitgruva i Tisbrottet i Sala. Tidigare har dessa två moment inte kombinerats under kontrollerade former där mätningar och observationer dokumenterats i så omfattande grad som i denna försöksserie. Rökdykarnas uppgift vid samtliga av försöken var att avancera in i tunneln och släcka branden. De sex olika försöken utgjordes av konventionell slangutläggning med slangkorgar respektive bärsele, utlägg med tomt system fram till brandplatsen, CAFS, skärsläckare och konventionell slangutläggning med hjälp av materielvagn och depåluft. Försöken visade att konventionell slangutläggning tar lång tid i anspråk, men att utlägg med tomt system och bärsele kan korta tiderna och minska belastningen. Försöken visade också att system med lägre vattenflöden hade möjligheter att slå ner branden, men att mängden vatten var avgörande för att undvika återantändning. Värmekameror är generellt inte anpassade för tunnelmiljöer och ett stort behov finns för vidare utveckling av både utrustning och utbildningsmaterial.

Abstract [en]

In October 2013 six full-scale fire tests were performed with combined movement and extinguishing in the Tistbrottet Mine in Sala. Earlier these two parts have not been combined under controlled test conditions, where measurements and observations have been documented as thouroughly, as in the Tistbrottet test series. The BA fire fighters task, in all performed tests, were to advance into the tunnel and extinguish the fire. The six different tests were represented of conventional hose lay-out with hose baskets, conventional hose lay-out with hose harnesses, full hose lay-out with empty system until reaching the scene of the fire, CAFS, cutting extinguisher and conventional hose lay-out with wagon aided movement and depot air supply. The tests showed that conventional hose lay-out with water filled hoses is time consuming, but that bot hose harnesses and later filling of the hoses can shorten the time. It was also shown that systems with lower water flows initially effectively can fight the fire, but that the amount of applied water is cruicial for if re-ignition occurs or not. Thermal image cameras are generally not customized for use in underground constructions and further development of both equipment and education material is needed.

sted, utgiver, år, opplag, sider
Västerås: Mälardalens högskola , 2014.
Serie
Studies in Sustainable Technology / Forskningsrapport ; 2014:1
Emneord [sv]
Räddningsinsats, tunnel, brand
HSV kategori
Forskningsprogram
energi- och miljöteknik
Identifikatorer
URN: urn:nbn:se:mdh:diva-27774ISBN: 978-91-7485-197-7 (tryckt)OAI: oai:DiVA.org:mdh-27774DiVA, id: diva2:799785
Prosjekter
Taktik och metodik vid brand under mark
Merknad

Denna version saknar bilagor, vilka kommer att tillföras i ett senare skede.

Tilgjengelig fra: 2015-03-31 Laget: 2015-03-31 Sist oppdatert: 2019-12-12bibliografisk kontrollert

Open Access i DiVA

fulltext(2436 kB)473 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 2436 kBChecksum SHA-512
f3dacb37eafe51055acab743a972a4fc75a8d3e1ec81c837941c8c3462e8efee43f13e45fd63e9221422d95061d2ccf3225ee3913586ea5093495efff5bf97b7
Type fulltextMimetype application/pdf

Person

Kumm, MiaPalm, AndersLönnermark, Anders

Søk i DiVA

Av forfatter/redaktør
Kumm, MiaPalm, AndersLönnermark, AndersIngason, Haukur
Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 482 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

isbn
urn-nbn

Altmetric

isbn
urn-nbn
Totalt: 1361 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf