https://www.mdu.se/

mdu.sePublikationer
Driftstörningar
Just nu har vi driftstörningar på sök-portalerna på grund av hög belastning. Vi arbetar på att lösa problemet, ni kan tillfälligt mötas av ett felmeddelande.
Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Contingency planning for Constructors during Construction of Tunnels
Mälardalens högskola, Akademin för hållbar samhälls- och teknikutveckling. (MERO Mälardalen Safety Science Lab)ORCID-id: 0000-0002-9598-0958
2010 (Engelska)Ingår i: / [ed] IQPC, 2010Konferensbidrag, Publicerat paper (Refereegranskat)
Abstract [en]

As the fire and rescue services has limited possibilities to perform rescue operations or to fight fires in tunnels under construction, the tunnel constructors have to work systematically with both prevention and mitigation within the field. During the construction phase the tunnel surroundings are essentially different from the phases later in the tunnel life cycle. The construction phase can be divided in two main parts – the tunnel before and after the break through. The possibilities both for safe evacuation and successful fire and rescue operations are considerable lower if a fire would occur when the tunnel only have one opening, before the break-through, when the tunnel has a “dead end” the smoke only can spread in one direction. A smoke filled tunnel not only put the evacuating people at risk, but also slows down the transportation speed of the fire and rescue services. Recent calculations shows that the fire and rescue services in some cases, with methods and equipment used today, do not reach the rescue chambers or the evacuating people in time. This paper discusses the fire and rescue services limitations under the construction phase, but from the contractor perspective. Recommendations regarding systematic fire prevention, risk reduction and fire mitigation are made and the importance of the interaction between the fire and rescue services and the tunnel contractors are discussed and analyzed.

Ort, förlag, år, upplaga, sidor
2010.
Nyckelord [en]
Tunnel during construction, fire, contingency planning, systematic fire prevention, fire and rescue operation, fire and rescue services
Nationell ämneskategori
Teknik och teknologier
Forskningsämne
energi- och miljöteknik
Identifikatorer
URN: urn:nbn:se:mdh:diva-11345OAI: oai:DiVA.org:mdh-11345DiVA, id: diva2:384914
Konferens
Tunnel Design & Construction, 25th -27th of October 2010, Zürich Switzerland
Projekt
TunnelbyggarenTillgänglig från: 2011-01-10 Skapad: 2011-01-10 Senast uppdaterad: 2016-01-08Bibliografiskt granskad

Open Access i DiVA

Fulltext saknas i DiVA

Person

Kumm, Mia

Sök vidare i DiVA

Av författaren/redaktören
Kumm, Mia
Av organisationen
Akademin för hållbar samhälls- och teknikutveckling
Teknik och teknologier

Sök vidare utanför DiVA

GoogleGoogle Scholar

urn-nbn

Altmetricpoäng

urn-nbn
Totalt: 352 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf