https://www.mdu.se/

mdh.sePublikasjoner
Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Contingency planning for Constructors during Construction of Tunnels
Mälardalens högskola, Akademin för hållbar samhälls- och teknikutveckling. (MERO Mälardalen Safety Science Lab)ORCID-id: 0000-0002-9598-0958
2010 (engelsk)Inngår i: / [ed] IQPC, 2010Konferansepaper, Publicerat paper (Fagfellevurdert)
Abstract [en]

As the fire and rescue services has limited possibilities to perform rescue operations or to fight fires in tunnels under construction, the tunnel constructors have to work systematically with both prevention and mitigation within the field. During the construction phase the tunnel surroundings are essentially different from the phases later in the tunnel life cycle. The construction phase can be divided in two main parts – the tunnel before and after the break through. The possibilities both for safe evacuation and successful fire and rescue operations are considerable lower if a fire would occur when the tunnel only have one opening, before the break-through, when the tunnel has a “dead end” the smoke only can spread in one direction. A smoke filled tunnel not only put the evacuating people at risk, but also slows down the transportation speed of the fire and rescue services. Recent calculations shows that the fire and rescue services in some cases, with methods and equipment used today, do not reach the rescue chambers or the evacuating people in time. This paper discusses the fire and rescue services limitations under the construction phase, but from the contractor perspective. Recommendations regarding systematic fire prevention, risk reduction and fire mitigation are made and the importance of the interaction between the fire and rescue services and the tunnel contractors are discussed and analyzed.

sted, utgiver, år, opplag, sider
2010.
Emneord [en]
Tunnel during construction, fire, contingency planning, systematic fire prevention, fire and rescue operation, fire and rescue services
HSV kategori
Forskningsprogram
energi- och miljöteknik
Identifikatorer
URN: urn:nbn:se:mdh:diva-11345OAI: oai:DiVA.org:mdh-11345DiVA, id: diva2:384914
Konferanse
Tunnel Design & Construction, 25th -27th of October 2010, Zürich Switzerland
Prosjekter
TunnelbyggarenTilgjengelig fra: 2011-01-10 Laget: 2011-01-10 Sist oppdatert: 2016-01-08bibliografisk kontrollert

Open Access i DiVA

Fulltekst mangler i DiVA

Person

Kumm, Mia

Søk i DiVA

Av forfatter/redaktør
Kumm, Mia
Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric

urn-nbn
Totalt: 352 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf